


A three-storey teaching building, built with modular integrated construction (MiC). Nine-tenths of the work happened in the factory: structure, services, finishes, staircases, ramps, washrooms and equipment spaces were integrated before the modules left; on campus they were simply lifted into place. Classroom modules run to 18 metres, so there are fewer on-site connections — and more open, adaptable teaching space. The building serves around 900 students. Work moved indoors means faster delivery, steadier quality, and far less noise, dust and wet trade on campus.